Karapiro Water Treatment Plant Capacity Upgrade
Waipa District Council
CLIENT:
2017 - 2018
YEAR:
The overall scope of this contract was to install, construct, test and commission a new prefabricated water treatment stream and all associated works to augment the existing Karapiro Water Treatment Plant (WTP).
Major works included:
Supply and installation of a Raw Water Pump Pontoon with Raw Water Pumps
Raw water pipework, including dosing points
Design and construct a New Water Treatment Plant Building
General pipework connections, including:- Filtered water pipework and connection to existing storage on site - Sludge pipework and Design-Build pump station/rising main - Overflow/Filter to Waste pipework - General drainage
Chemical Storage Tank Replacement
Chemical Dosing/Pipework
Powdered Activated Carbon (PAC) facility, including repurposing of existing PAC dosing equipment within a new design-build facility shed
Instrumentation, electrical and control systems, including electrical cabling, motor starters and MCC boards
Software Control Programming, Software FAT testing and SAT testing
Backwash pump and pipework
Site Earthworks and Hardstand Pavement
Site Landscaping
Sludge Management System upgrade
This project was completed in December 2018.