CLIENT:
YEAR:
The scope included replacing 4 existing wastewater rising mains in Raglan and the upgrade of 25 pump stations across the Waikato District.
Works included:
Installation of four new HDPE Wastewater Rising Mains and live connections to the network
Replacement of Pumps within existing Pump Stations
Construction of new Valve Chambers
Valve and Pump Riser replacement
Installation of new wash down stations at various Pump Station sites.
These works were coordinated around school terms and holiday festivals to reduce risk at peak times.
Innovation:
Prefabricated PE manholes were used to minimise temporary works where manholes were replaced in coastal environments. This reduced the environmental risk.