Construction of a new Wastewater Scheme for the Waikeria Prison upgrade. The project involved construction of:
A new WW Pump Station at the Prison consisting of an 8m deep secant piled wet well, two steel panel WW storage tanks, inlet works, and a Control Building together with associated civil siteworks, mechanical and electrical installations.
10km of 280 OD PE rising main between Waikeria Prison and Kihikihi were laid to connect the new Pump Station to the existing Te Awamutu WW network.
A new receiving pump station was constructed in Albert Park consisting of a fibreglass wet well and three fibreglass underground storage tanks
a further 2.5km of 315-500OD PE rising main laid through Te Awamutu to connect to the existing WWTP.